Pre-Slab / Foundation Inspection
This inspection is performed before concrete is poured and verifies critical components including plumbing rough-in, vapor barrier placement, rebar installation, and form layout. Issues at this stage can impact the entire structure and are difficult to correct once the slab is complete.
Who Needs This and Why
Homeowners building new construction and builders seeking third-party quality control benefit from verifying that foundational elements are properly installed before the slab is poured.
What Is Included
Inspection of plumbing rough-in, vapor barrier installation, rebar placement, slab preparation, and form alignment.